On 29 June 2024, we received an access arrangement proposal from Jemena Gas Networks (NSW) Ltd (JGN) for the period from 1 July 2025 to 30 June 2030.
On this page
Proposal
JGN - Att 1.2 - Background to JGN's 2025-30 Access Arrangement Proposal - June 2024
Confidentiality claims
JGN - Att 1.4 - Confidentiality claims in JGN 2025-30 AA proposal - June 2024
JGN - RIN - Att 16 - Confidentiality claims in JGN 2025-30 reset RIN - June 2024
Models
JGN - Frontier Economics - Att 6.9M - Estimated UAG rates - August 2023
Supporting information
The following documents are too large to publish on the web. If you would like a copy please email jgn2025aer [dot] gov [dot] au (jgn2025[at]aer[dot]gov[dot]au).
JGN - BD Infrastructure - Att 2.2 - Customer forum engagement report
JGN - Att 3.2 - Small business Retailer and Large User engagement report
JGN - Att 2.1 - Consumer Challenge Panel feedback and response - June 2024
JGN - KPMG - Att 2.7 - Reconvened Advisory Board and Expert Panel Report
JGN - BD Infrastructure - Att 3.1 Tariffs Consultation Report - June 2024
JGN - Sagacity and JD Insights - Att 3.3 - Sagacity and JDI report – June 2024
JGN - Redbridge - Att 3.4 - Sydney Energy Attitudes and Sentiments Report - Dec 2023
JGN - Oxford Economics - Att 5.5 - Input cost escalation - April 2024
JGN - CEG - Att 6.4 - Relative efficiency and forecast productivity growth of JGN - April 2024
JGN - Att 7.2 - Ancillary services cost build up approach - June 2024
JGN - Blunomy - Att 7.5 Long-term demand forecast report - March 2023
JGN - Core Energy - Att 8.3 - Demand Forecast Report Addendum - April 2024
JGN - Att 9.1 - Explanation of proposed revisions to the 2020-25 AA - June 2024
JGN - Att 9.2 - Explanation of proposed revisions to the RSA - June 2024
Regulatory information notice
Jemena Gas Networks has provided a large number of RIN attachments and capex supporting documents in relation to RIN clause 4.3. To see a list of the documents included, please refer to JGN - RIN - Att 19 - Document Index - June 2024.
JGN - RIN - 4.3.5 - ICT Investment Brief - Asset Investment Optimisation - June 2024
JGN - RIN - 4.3.5 - ICT Investment Brief - Contract Lifecycle Management - June 2024
JGN - RIN - 4.3.5 - ICT Investment brief - Cybersecurity Program - June 2024
JGN - RIN - 4.3.5 - ICT Investment Brief - Data Foundations and Governance - June 2024
JGN - RIN - 4.3.5 - ICT Investment Brief - Enhancements to Geospatial Systems - June 2024
JGN - RIN - 4.3.5 - ICT Investment Brief - Enterprise Content Management Uplift - June 2024
JGN - RIN - 4.3.5 - ICT Investment Brief - Gas Retail Markets Settlement - Major Application Lifecycle - June 2024
JGN - RIN - 4.3.5 - ICT Investment Brief - Network Management Advanced Analytics - June 2024
JGN - RIN - 4.3.5 - ICT Investment Brief - Works Management Schedule Optimisation - June 2024
JGN - RIN - 4.4 - Emissions Monitoring - Picarro - CBAM - June 2024
JGN - RIN - 4.4 - 10038202 - SPL Hoxton to Tempe ILI - PEMO - June 2024
JGN - RIN - 4.4 - 10043314 - SPM Horsley to Lidcombe ILI - PEMO - June 2024
JGN - RIN - 4.4 - 10043315 - SPM Horsley to Lidcombe Validation Digs - PEMO - June 2024
JGN - RIN - 4.4 - 10043327 - SPM Putney to SB Validation Digs - PEMO - June 2024
JGN - RIN - 4.4 - 10043332 - Licence 1 Validation Digs - PEMO - June 2024
JGN - RIN - 4.4 - 10067996 - SPL Hoxton to Tempe Validation Digs - PEMO - June 2024
JGN - RIN - 4.4 - 10068006 - Licence 2A Validation Digs - PEMO - June 2024
JGN - RIN - 4.4 - 10068008 - Penrith Primary Validation Digs - PEMO - June 2024
JGN - RIN - 4.4 - 10068011 - Licence 8C Validation Digs - PEMO - June 2024
JGN - RIN - 4.4 - 10069263 - SPM Mortlake to Putney ILI - PEMO - June 2024
JGN - RIN - 4.4 - 10069268 - SPM Mortlake to Putney Validation Digs - PEMO - June 2024
JGN - RIN - 4.7.2 - Zinfra Gas Enterprise Agreement NSW 2021 - June 2024
JGN - RIN – 4.8.1 - Capitalisation Policy Intangible Assets (JAA FIN GU 0013) - June 2024
JGN - RIN – 4.8.1 - Capitalisation Policy Property, Plant & Equipment (JAA FIN GU 0012) - June 2024
JGN - RIN – 4.8.1 - Regulatory Accounting Principles & Policies - June 2024
Regulatory information notice - Supporting capex information
JGN - RIN - 4.3 - R-RA5-AA - End of Life Replacement of Residential and Small I&C Meter Remote Reading Techno
JGN - RIN - 4.3 - R-RA6 - End of Life Replacement of Metreteks - PEMO - June 2024
JGN - RIN - 4.3 - R-RDZ - Digital Metering for Chronic No Access Meters - BC - June 2024
JGN - RIN - 4.3 - 10000024 - Gymea Bay 210 kPa CDP - PEMO - June 2024
JGN - RIN - 4.3 - 10018695 - Horsley Park TRS - Facilities Obsolescence - CBAM - June 2024
JGN - RIN - 4.3 - 10018695 - Horsley Park TRS - Facilities Obsolescence - OA - June 2024
JGN - RIN - 4.3 - 10018695 - Horsley Park TRS - Facilities Obsolescence - PEMO - June 2024
JGN - RIN - 4.3 - 10018703 - Hexham TRS - Facilities Obsolescence - CBAM - June 2024
JGN - RIN - 4.3 - 10018703 - Hexham TRS - Facilities Obsolescence - OA - June 2024
JGN - RIN - 4.3 - 10018703 - Hexham TRS - Facilities Obsolescence - PEMO - June 2024
JGN - RIN - 4.3 - 10018708 - Kooragang Island TRS - Facilities Obsolescence - CBAM - June 2024
JGN - RIN - 4.3 - 10018708 - Kooragang Island TRS - Facilities Obsolescence - OA - June 2024
JGN - RIN - 4.3 - 10018708 - Kooragang Island TRS - Facilities Obsolescence - PEMO - June 2024
JGN - RIN - 4.3 - 10018717 - Mascot PRS - Facilities Obsolescence - CBAM - June 2024
JGN - RIN - 4.3 - 10018717 - Mascot PRS - Facilities Obsolescence - OA - June 2024
JGN - RIN - 4.3 - 10018717 - Mascot PRS - Facilities Obsolescence - PEMO - June 2024
JGN - RIN - 4.3 - 10020148 - Flemington PRS - Facilities Obsolescence - CBAM - June 2024
JGN - RIN - 4.3 - 10020148 - Flemington PRS - Facilities Obsolescence - OA - June 2024
JGN - RIN - 4.3 - 10020148 - Flemington PRS - Facilities Obsolescence - PEMO - June 2024
JGN - RIN - 4.3 - 10020149 - Tempe PRS - Facilities Obsolescence - CBAM - June 2024
JGN - RIN - 4.3 - 10020149 - Tempe PRS - Facilities Obsolescence - OA - June 2024
JGN - RIN - 4.3 - 10020149 - Tempe PRS - Facilities Obsolescence - PEMO - June 2024
JGN - RIN - 4.3 - 10020150 - Auburn PRS - Facilities Obsolescence - CBAM - June 2024
JGN - RIN - 4.3 - 10020150 - Auburn PRS - Facilities Obsolescence - OA - June 2024
JGN - RIN - 4.3 - 10020150 - Auburn PRS - Facilities Obsolescence - PEMO - June 2024
JGN - RIN - 4.3 - 10020151 - Plumpton TRS - Facilities Obsolescence - CBAM - June 2024
JGN - RIN - 4.3 - 10020151 - Plumpton TRS - Facilities Obsolescence - OA - June 2024
JGN - RIN - 4.3 - 10020151 - Plumpton TRS - Facilities Obsolescence - PEMO - June 2024
JGN - RIN - 4.3 - 10020153 - Penrith PRS - Facilities Obsolescence - CBAM - June 2024
JGN - RIN - 4.3 - 10020153 - Penrith PRS - Facilities Obsolescence - OA - June 2024
JGN - RIN - 4.3 - 10020153 - Penrith PRS - Facilities Obsolescence - PEMO - June 2024
JGN - RIN - 4.3 - 10020181 - Bathurst TRS - Facilities Obsolescence - OB - June 2024
JGN - RIN - 4.3 - 10020181 - Bathurst TRS - Facilities Obsolescence - PEMO - June 2024
JGN - RIN - 4.3 - 10022499 - Strathfield CBD 7kPa Mains Rehabilitation - BC - June 2024
JGN - RIN - 4.3 - 10022499 - Strathfield CBD 7kPa Mains Rehabilitation - CBAM - June 2024
JGN - RIN - 4.3 - 10022499 - Strathfield CBD 7kPa Mains Rehabilitation - OCM - June 2024
JGN - RIN - 4.3 - 10022499 - Strathfield CBD 7kPa Mains Rehabilitation - PEMO - June 2024
JGN - RIN - 4.3 - 10022508 - Haberfield Strathfield Campsie 7kPa Rehabilitation - BC - June 2024
JGN - RIN - 4.3 - 10022508 - Haberfield Strathfield Campsie 7kPa Rehabilitation - CBAM - June 2024
JGN - RIN - 4.3 - 10022508 - Haberfield Strathfield Campsie 7kPa Rehabilitation - OCM - June 2024
JGN - RIN - 4.3 - 10022508 - Haberfield Strathfield Campsie 7kPa Rehabilitation - PEMO - June 2024
JGN - RIN - 4.3 - 10022511 - Newcastle MP1 30kPa Rehabilitation Stage 1 - PEMO - June 2024
JGN - RIN - 4.3 - 10022734 - Bankstown Chullora Greenacre 7kPa Rehabilitation - BC - June 2024
JGN - RIN - 4.3 - 10022734 - Bankstown Chullora Greenacre 7kPa Rehabilitation - CBAM - June 2024
JGN - RIN - 4.3 - 10022734 - Bankstown Chullora Greenacre 7kPa Rehabilitation - OCM - June 2024
JGN - RIN - 4.3 - 10022734 - Bankstown Chullora Greenacre 7kPa Rehabilitation - PEMO - June 2024
JGN - RIN - 4.3 - 10033694 - SPM - Lidcombe to Banksmeadow Pigging Facilities - CBAM - June 2024
JGN - RIN - 4.3 - 10033694 - SPM - Lidcombe to Banksmeadow Pigging Facilities - OA - June 2024
JGN - RIN - 4.3 - 10033694 - SPM - Lidcombe to Banksmeadow Pigging Facilities - PEMO - June 2024
JGN - RIN - 4.3 - 10033695 - SPM - Putney - Stringybark Pigging Facilities - BC - June 2024
JGN - RIN - 4.3 - 10033695 - SPM - Putney - Stringybark Pigging Facilities - CBAM - June 2024
JGN - RIN - 4.3 - 10033695 - SPM - Putney - Stringybark Pigging Facilities - PEMO - June 2024
JGN - RIN - 4.3 - 10038241 - Lic 2B and WPM Integrity Management - CBAM - June 2024
JGN - RIN - 4.3 - 10038241 - Lic 2B and WPM Integrity Management - OA - June 2024
JGN - RIN - 4.3 - 10038241 - Lic 2B and WPM Integrity Management - PEMO - June 2024
JGN - RIN - 4.3 - 10043035 - SPM Integrity Management - Phase 2 - BC - June 2024
JGN - RIN - 4.3 - 10043035 - SPM Integrity Management - Phase 2 - CBAM - 20240628 - Public
JGN - RIN - 4.3 - 10033695 - SPM - Putney - Stringybark Pigging Facilities - PEMO - June 2024
JGN - RIN - 4.3 - 10053729 - SPM Exposed Main - Richardson Cr, Marrickville - PEMO - June 2024
JGN - RIN - 4.3 - 10054436 - Bayview Low Pressure CDP - PEMO - June 2024
JGN - RIN - 4.3 - 10054437 - Woolwich Low Pressure CDP - PEMO - June 2024
JGN - RIN - 4.3 - 10057750 - Edmondson Park Soldiers Pde Steel Main - CBAM - June 2024
JGN - RIN - 4.3 - 10057750 - Edmondson Park Soldiers Pde Steel Main - PEMO - June 2024
JGN - RIN - 4.3 - 10065203 - Catalytic Heaters Project Package Phase 2 - CBAM - June 2024
JGN - RIN - 4.3 - 10065203 - Catalytic Heaters Project Package Phase 2 - OA - June 2024
JGN - RIN - 4.3 - 10065203 - Catalytic Heaters Project Package Phase 2 - PEMO - June 2024
JGN - RIN - 4.3 - 10065204 - Catalytic Heaters Project Package Phase 3 - CBAM - June 2024
JGN - RIN - 4.3 - 10065204 - Catalytic Heaters Project Package Phase 3 - OA - June 2024
JGN - RIN - 4.3 - 10065204 - Catalytic Heaters Project Package Phase 3 - PEMO - June 2024
JGN - RIN - 4.3 - 10065205 - Catalytic Heaters Project Package Phase 4 - CBAM - June 2024
JGN - RIN - 4.3 - 10065205 - Catalytic Heaters Project Package Phase 4 - OA - 20240628 - Public
JGN - RIN - 4.3 - 10065205 - Catalytic Heaters Project Package Phase 4 - PEMO - 20240628 - Public
JGN - RIN - 4.3 - 10068009 - Northern Trunk - Lic 8c - Pigging Facilities - CBAM - June 2024
JGN - RIN - 4.3 - 10068009 - Northern Trunk - Lic 8c - Pigging Facilities - OA - June 2024
JGN - RIN - 4.3 - 10068009 - Northern Trunk - Lic 8c - Pigging Facilities - PEMO - June 2024
JGN - RIN - 4.3 - 10068019 - Licence 7 - Plumpton to Pitt Town Isolation - CBAM - June 2024
JGN - RIN - 4.3 - 10068019 - Licence 7 - Plumpton to Pitt Town Isolation - OA - June 2024
JGN - RIN - 4.3 - 10068019 - Licence 7 - Plumpton to Pitt Town Isolation - PEMO - June 2024
JGN - RIN - 4.3 - 10068313 - ALBV Panel Obsolescence - Phase 1 - PEMO - June 2024
JGN - RIN - 4.3 - 10068323 - ALBV Panel Obsolescence - Phase 1 - CBAM - June 2024
JGN - RIN - 4.3 - 10068323 - ALBV Panel Obsolescence - Phase 1 - OA - June 2024
JGN - RIN - 4.3 - 10068323 - ALBV Panel Obsolescence - Phase 2 - CBAM - June 2024
JGN - RIN - 4.3 - 10068323 - ALBV Panel Obsolescence - Phase 2 - OA - June 2024
JGN - RIN - 4.3 - 10068323 - ALBV Panel Obsolescence - Phase 2 - PEMO - June 2024
JGN - RIN - 4.3 - 10068368 - Trial of Remote Reading Technology for Large I&C Meters - PEMO - June 2024
JGN - RIN - 4.3 - 10068650 - Kurri Kurri Rehabilitation Stage 2 - CBAM - June 2024
JGN - RIN - 4.3 - 10068650 - Kurri Kurri Rehabilitation Stage 2 - OCM - June 2024
JGN - RIN - 4.3 - 10068650 - Kurri Kurri Rehabilitation Stage 2 - BC - June 2024
JGN - RIN - 4.3 - 10068650 - Kurri Kurri Rehabilitation Stage 2 - PEMO - June 2024
JGN - RIN - 4.3 - 10068673 - Pennant Hills Rd 350mm Steel Main Rehabilitation - CBAM - June 2024
JGN - RIN - 4.3 - 10068673 - Pennant Hills Rd 350mm Steel Main Rehabilitation - OA - June 2024
JGN - RIN - 4.3 - 10068673 - Pennant Hills Rd 350mm Steel Main Rehabilitation - PEMO - June 2024
JGN - RIN - 4.3 - 10068691 - Richmond Rd 150mm Steel Mains Rehabilitation - OB - June 2024
JGN - RIN - 4.3 - 10068691 - Richmond Rd 150mm Steel Mains Rehabilitation - PEMO - June 2024
JGN - RIN - 4.3 - 10068727 - Figtree CDP - Stage 2 - PEMO - June 2024
JGN - RIN - 4.3 - 10068848 - Umina Beach Low Pressure CDP - PEMO - June 2024
JGN - RIN - 4.3 - 10069080 - Newcastle MP1 30kPa Rehabilitation Stage 2 - PEMO - June 2024
JGN - RIN - 4.3 - 10069081 - Newcastle MP1 30kPa Rehabilitation Stage 3 - PEMO - June 2024
JGN - RIN - 4.3 - 10069192 - Facilities Water Ingress – Flemington PRS - CBAM - June 2024
JGN - RIN - 4.3 - 10069192 - Facilities Water Ingress – Flemington PRS - OA - June 2024
JGN - RIN - 4.3 - 10069192 - Facilities Water Ingress – Flemington PRS - PEMO - June 2024
JGN - RIN - 4.3 - 10069193 - Facilities Water Ingress - Mascot PRS - CBAM - June 2024
JGN - RIN - 4.3 - 10069193 - Facilities Water Ingress - Mascot PRS - PEMO - June 2024
JGN - RIN - 4.3 - 10069194 - Facilities Water Ingress - Tempe PRS - CBAM - June 2024
JGN - RIN - 4.3 - 10069195 - Facilities Water Ingress - Wetherill Park & Lidcombe PRS - CBAM - June 2024
JGN - RIN - 4.3 - 10069195 - Facilities Water Ingress - Wetherill Park & Lidcombe PRS - PEMO - June 2024
JGN - RIN - 4.3 - 10070627 - SPM - Mortlake to Putney Pigging Facilities - CBAM - June 2024
JGN - RIN - 4.3 - 10070627 - SPM - Mortlake to Putney Pigging Facilities - OA - June 2024
JGN - RIN - 4.3 - 10070627 - SPM - Mortlake to Putney Pigging Facilities - PEMO - June 2024
JGN - RIN - 4.3 - 10071182 - Blue Mountain Pressure Reduction Glenbrook-Springwood - PEMO - June 2024
JGN - RIN - 4.3 - 13033949 - Campsie (Sydney South) - CBAM - June 2024
JGN - RIN - 4.3 - 13033949 - Campsie (Sydney South) - PEMO - June 2024
JGN - RIN - 4.3 - AA_R-GEAU - Upgrade of Mastercom Radios for Emergency Response - CBAM - June 2024
JGN - RIN - 4.3 - AA_R-GEAU - Upgrade of Mastercom Radios for Emergency Response - OA - June 2024
JGN - RIN - 4.3 - Connection and Metering Forecast Methodology - June 2024
JGN - RIN - 4.3 - Facilities - Water Ingress Projects - OA - June 2024
JGN - RIN - 4.3 - Jemena Infrastructure Cost Estimation Methodology - June 2024
JGN - RIN - 4.3 - Newcastle MP1 30kPa Rehabilitation - BC - June 2024
JGN - RIN - 4.3 - Newcastle MP1 30kPa Rehabilitation - CBAM - June 2024
JGN - RIN - 4.3 - Newcastle MP1 30kPa Rehabilitation - OCM - June 2024
Issues paper
On 23 August 2024, we published our Issues paper on the early signal pathway expectations for Jemena Gas Networks’ (NSW) 2025–30 access arrangement.
Submissions on our Issues paper are due by 13 September 2024.
AER - Issues Paper - Jemena Gas Networks (NSW) - 2025-30 Access Arrangement - August 2024
Submissions
We invited energy consumers and other interested parties to make submissions on Jemena Gas Networks' (NSW) access arrangement proposal. Submissions closed on Friday, 13 September 2024.
The following submissions were received:
Aeris Capital & Arena Energy - Submission on JGN 2025-30 Access Arrangement Proposal - September 2024
Alinta Energy - Submission on JGN 2025-30 Access Arrangement Proposal - September 2024
Ausgrid - Submission on JGN 2025-30 Access Arrangement Proposal - September 2024
Better Renting - Submission on JGN 2025-30 Access Arrangement Proposal - September 2024
CCP31 - Advice to the AER - JGN 2025-30 Access Arrangement Proposal and Issues paper - September 2024
ECA - Submission on JGN 2025-30 Access Arrangement Proposal - September 2024
ECA - Submission on JGN 2025-30 Access Arrangement Proposal - Attachment - Dynamic Analysis Report - September 2024
IEEFA - Submission on JGN 2025-30 Access Arrangement Proposal - September 2024
JEC - Submission on JGN 2025-30 Access Arrangement Proposal - September 2024
Red and Lumo - Submission on JGN 2025-30 Access Arrangement Proposal - September 2024
Rewiring Australia - Submission on JGN 2025-30 Access Arrangement Proposal - September 2024
Public forum
On Monday, 2 September 2024 at 2-3 pm (AEST) we hosted a public forum to discuss with stakeholders our Issues paper on the early signal pathway expectations for Jemena Gas Networks’ (NSW) 2025–30 access arrangement.
The combined presentation slides are now available.