Overview

Decision

The AER released the 2015 annual benchmarking report for DNSPs and TNSPs in November 2015.

 

Please note: due to the identification of an error during the preparation of the 2020 Annual Benchmarking Report, the productivity index number results in annual benchmarking reports preceding the 2020 Report are not accurate. This error does not impact the econometric opex cost function models or the partial performance indicators. Please see the 2020 Annual Benchmarking Report for corrected results and for more information on the error which relates to the non-reliability output weights.

Supporting information

Economic Insights reports.

Supporting information

Underlying calculations for the benchmarking reports.

Submissions

Under the National Electricity Rules, we must consult with networks in the development of performance reports. We received the following submissions from electricity networks.

CitiPower & Powercor submission on draft distribution annual benchmarking report - 9 October 2015

Download
Authors
Powercor Australia
CitiPower
Content type
Document

SAPN submission on draft distribution annual benchmarking report - 9 October 2015

Download
Authors
SA Power Networks
Content type
Document

TasNetworks letter to AER re MTFP benchmarking bias - 28 August 2015

Download
Authors
TasNetworks
Content type
Document