Overview

Decision

The AER released the 2014 annual benchmarking report for DNSPs and TNSPs in November 2014.

 

Please note: due to the identification of an error during the preparation of the 2020 Annual Benchmarking Report, the productivity index number results in annual benchmarking reports preceding the 2020 Report are not accurate. This error does not impact the econometric opex cost function models or the partial performance indicators. Please see the 2020 Annual Benchmarking Report for corrected results and for more information on the error which relates to the non-reliability output weights.

Supporting information

Economic Insights prepared MTFP indexes for the benchmarking reports. The reports prepared by Economic Insights explaining the development of these MTFP indicies are provided below.

In January 2015, we published memos by Economic Insights from July 2014, at the request of stakeholders.

Supporting information

The underlying calculations for the benchmarking reports.

DNSP Annual Benchmarking Report PPIs and underlying data

Download
Authors
AER
Content type
Document

TNSP Annual Benchmarking Report PPIs and underlying data

Download
Authors
AER
Content type
Document

DNSP Productivity files 17 November 2014

Download
Authors
Economic Insights Pty Ltd
Content type
Document

TNSP Productivity files 6 November 2014

Download
Authors
Economic Insights Pty Ltd
Content type
Document

Submissions

Under the National Electricity Rules, the AER must consult with networks in the development of performance reports. The AER received the following submissions from electricity networks.

Powerlink submission on draft transmission annual benchmarking report - 22 August 2014

Download
Authors
Powerlink Queensland
Content type
Document