Overview

Application

On 20 April 2018, Powercor submitted an application to the AER seeking a determination, with respect to the installation of REFCLs and associated works, that funding for a contingent project be approved and their maximum allowed revenue be adjusted in accordance with clause 6.6A.2 of the NER.

Powercor contingent project application REFCL tranche two - 20 April 2018

Download
Authors
Powercor Australia
Content type
Document

Supporting information

REFCL2.01 - Ballarat North functional design scope - v1.0

Download
Authors
Powercor Australia
Content type
Document

REFCL2.02 Ballarat South functional design scope - v1.0

Download
Authors
Powercor Australia
Content type
Document

REFCL2.03 Bendigo Terminal Station functional desing scope - v1.0

Download
Authors
Powercor Australia
Content type
Document

REFCL2.04 Bendigo functional design scope - v1.0

Download
Authors
Powercor Australia
Content type
Document

REFCL2.05 Charlton functional desing scope - v1.0

Download
Authors
Powercor Australia
Content type
Document

REFCL2.06 Geelong functional design scope - v1.0

Download
Authors
Powercor Australia
Content type
Document

REFCL2.07 Geelong zone substation options analysis v1.0

Download
Authors
Powercor Australia
Content type
Document

REFCL2.09 Powercor Bushfire mitigation plan - Revision 4.1

Download
Authors
Powercor Australia
Content type
Document

REFCL2.10 XLPE cable review v1.0

Download
Authors
Powercor Australia
Content type
Document

REFCL2.11 Implementation and optimisation of REFCL systems rev 0.4

Download
Authors
Powercor Australia
Content type
Document

REFCL2.12 HV customer assets and REFCL protected networks report - 21 June 2017

Download
Authors
Marxsen Consulting Pty Ltd
Content type
Document

Models

On 15 June 2018, Powercor further amended the models. The revised models are also provided.

REFCL2_MOD.01 - Expenditure build-up model (tranche two)

Download
Authors
Powercor Australia
Content type
Document

REFCL2_MOD.02 - Amended PTRM

Download
Authors
Powercor Australia
Content type
Document

REFCL2_MOD.03 - Amended depreciation model

Download
Authors
Powercor Australia
Content type
Document

REFCL2_MOD.04 - Amended REPEX model

Download
Authors
Powercor Australia
Content type
Document

REFCL2_MOD.01 - Expenditure build-up model (tranche two) - revised 15 June 2018

Download
Authors
Powercor Australia
Content type
Document

REFCL2_MOD.02 - Amended PTRM - revised 15 June 2018

Download
Authors
Powercor Australia
Content type
Document

REFCL2_MOD.03 - Amended depreciation model - revised 15 June 2018

Download
Authors
Powercor Australia
Content type
Document

REFCL2_MOD.04 - Amended REPEX model - revised 15 June 2018

Download
Authors
Powercor Australia
Content type
Document

Submissions

-

Submissions on Powercor's contingent project application closed on 15 June 2018.Three submissions were received. Groundline Engineering provided both a public submission and a confidential submission, which contains proprietary information.  The Victorian Government and Powercor each made a submission. The Powercor submission includes modified models, which have been added under the Models heading.

Project administration

On 4 May 2018, the AER issued a notice to extend the deadline for making a decision in accordance with clause 6.6A.2(j) of the NER. The new date for the decision is on or before 10 September 2018.