Project timeline

Consultation paper (first draft determination)

On 22 March 2024 we released our consultation paper* on the VCR methodology (consultation paper) and commenced our formal consultation under the National Electricity Rules. 

It sets out the updated VCR methodology (by way of proposed amendments to the 2019 VCR methodology), the reasons for the updated VCR methodology and the reasons for considering the proposed amendments to the VCR methodology are a Non-material Proposal.

* The consultation paper was initially published as a draft determination under the expedited rules consultation procedure. Following stakeholder feedback, we decided to switch to the standard rules consultation procedure and the draft is now considered a consultation paper. 

2024-03-22 AER - Consultation paper (first draft determination) - 2024 VCR methodology

Our first draft determination commenced our formal consultation for the VCR, setting out our proposed amendments to the methodology for 2024.
Download
Authors
AER
Content type
Document

Public forum

We held an online stakeholder forum on 4 April 2024. The forum was attended by a range of stakeholders and there were presentations from the AER, the AEMC and the EUAA.

The forum provided an opportunity for stakeholders to discuss our draft determination on the values of customer reliability methodology. Stakeholders also had the opportunity to ask questions about, and comment on, the three presentations.

2024-04-04 AER - VCR public forum presentation

Download
Authors
AER
Content type
Document

AEMC - VCR public forum presentation - 4 April 2024

Download
Authors
Australian Energy Market Commission (AEMC)
Content type
Document

EUAA - VCR public forum presentation - 4 April 2024

Download
Authors
Energy Users Association of Australia (EUAA)
Content type
Document

Submissions on consultation procedure

-

Our formal consultation commenced with the publication of our draft determination on 22 March 2024 using the expedited rules consultation procedure in the National Electricity Rules (NER). Submissions on the Values of Customer Reliability draft determination closed on 9 April 2024.

Energy Users Association of Australia (EUAA) - submission on consultation procedure - VCR 2024

Download
Authors
Energy Users Association of Australia (EUAA)
Content type
Document

Public Interest Advocacy Centre (PIAC) - submission on consultation procedure - VCR 2024

Download
Authors
Public Interest Advocacy Centre (PIAC)
Content type
Document

Bartley Consulting - submission on consultation procedure - VCR 2024

Download
Authors
Bartley Consulting
Content type
Document

Submissions on first draft determination

-

Submissions on the Values of Customer Reliability first draft determination closed on 23 April 2024.

2024-04-22 Essential Energy - submission on draft determination - VCR

Download
Authors
Essential Energy
Content type
Document

2024-04-23 SAPN - submission on draft determination - VCR

Download
Authors
SA Power Networks
Content type
Document

2024-04-23 ENA - submission on draft determination - VCR

Download
Authors
Energy Networks Australia (ENA)
Content type
Document

2024-04-23 TasNetworks - submission on draft determination - VCR

Download
Authors
TasNetworks
Content type
Document

2024-04-23 Ausgrid - submission on draft determination - VCR

Download
Authors
Ausgrid
Content type
Document

2024-04-23 Evoenergy - submission on draft determination - VCR

Download
Authors
Evoenergy
Content type
Document

2024-04-23 AusNet - submission on draft determination - VCR

Download
Authors
AusNet
Content type
Document

2024-04-23 PIAC - submission on draft determination - VCR

Download
Authors
Public Interest Advocacy Centre (PIAC)
Content type
Document

2024-04-23 Citipower, Powercor and United Energy - submission on draft determination - VCR

Download
Authors
CitiPower / Powercor / United Energy
Content type
Document

2024-04-24 EUAA - submission on draft determination - VCR

Download
Authors
Energy Users Association of Australia (EUAA)
Content type
Document