On 15 April 2016 the AER approved the Applicant’s exemption from the requirement to register as a network service provider and the operation of Chapter 5 of the NER. The exemption was granted under clause 2.5.1 of the NER in accordance with the AER’s Electricity NSP Registration Exemption Guideline, and is subject to a number of conditions.
Applicable conditions for exemption
Network conversion (creation of an embedded network at a site with existing energy consumers)
On 21 September 2021 the AER accepted an application from Stockland Aevum Limited for an individual exemption to include additional buildings at this site (Glentworth House and Seaview Heights) into the existing embedded network, that were not subject of the exemption registered on 15 April 2016.
As the applicant was unable to attain consent from all energy consumers at this site for the proposed inclusions into the embedded network, and as it is a residential site they were required to apply for a Notice of Acceptance before being eligible to include the additional buildings.
This Notice of Acceptance (below) confirms the eligibility of the applicant to proceed with the proposed embedded network inclusions at this site having supplied the necessary evidence of meeting the criteria specified in the Network Exemption Guideline. The exemption holder must comply with the network conversion conditions under section 4.9 of the Network Exemption Guideline in addition to the standard conditions for the registered exemption classes.
Change of registered business
On 29 July 2022, Stockland Aevum Ltd’s legal name changed to Australian Retirement Services Pty Ltd.
On 26 August 2022, Australian Retirement Services Pty Ltd’s legal name changed to Levande Pty Ltd.