Results
16071 result(s), displaying 16045 to 16056
South Street Energy Pty Ltd - Crossroads Homemaker Centre Casula application for individual retail exemption
On 17 January 2025, the AER accepted an application from South Street Energy Pty Ltd for an individual exemption.
Type
Retail exemptions
Status
Open
Jemena - Ring Fencing Decision - Phillip Creek Compressor Station
The AER has made a draft decision to grant exemptions to Jemena from their ring-fencing obligations for the Phillip Creek Compressor Station.
Type
Ring-fencing
Status
Open
Kurri Kurri Lateral Pipeline classification decision
On 6 December 2024, APA Group (APA) applied for a classification decision for its Kurri Kurri Lateral Pipeline (KKPL).
Type
Determinations
Status
Open
Ergon Energy Ring-fencing Waiver - Field Services for Powerlink - October 2024
Ergon Energy Network is requesting a ring-fencing waiver in order to provide field services to Powerlink
Type
Ring-fencing
Status
Open
Powerlink Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that Powerlink can earn from customers over the period 1 July 2027 to 30 June 2032.
Type
Determinations
Status
Open
AusNet Services Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that AusNet Services can earn from customers over the period 1 April 2027 to 31 March 2032.
Type
Determinations
Status
Open
PARKSTONE RETAIL NO. 1 PTY LTD - Hinkler Central network exemption
PARKSTONE RETAIL NO. 1 PTY LTD - Hinkler Central network exemption
Type
Network exemptions
Status
Current
South Australia: December 2026 - February 2027
In its September 2023 update to the 2023 ESOO AEMO has forecast a 205 MW reliability gap in South Australia in 2026–27.
Type
Retail Reliability Obligation
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open