Sector
Electricity
Segment
Transmission
Region
South Australia
Status
Current
Commencement date
Effective date

ElectraNet's cost allocation method (CAM) governs the manner in which ElectraNet is allowed to allocate costs to the transmission services that it provides. The allocation of costs between the services is requried to accurately represent the costs incurred in providing those services. This prevents cross-subsidisation between the transmission and other services that ElectraNet provides.

The assessment of ElectraNet's CAM was based on the advice of McGrathNicol Corporate Advisory. On 29 August 2008, the AER approved ElectraNet's CAM in accordance with chapter 6A of the National Electricity Rules, concluding that it was consistent with the AER's Cost Allocation Guidelines.

Key Documents

ElectraNet - review of cost allocation method - McGrathNicol

Download
Authors
McGrathNicol
Content type
Document

ElectraNet - cost allocation method

Download
Authors
ElectraNet
Content type
Document

ElectraNet - cost allocation method - final decision

Download
Authors
AER
Content type
Document

Documents

ElectraNet - cost allocation method

Download
Authors
ElectraNet
Content type
Document

ElectraNet - review of cost allocation method - McGrathNicol

Download
Authors
McGrathNicol
Content type
Document

ElectraNet - cost allocation method - final decision

Download
Authors
AER
Content type
Document