Results
18 result(s), displaying 1 to 12
Amending the Post Tax Revenue Model in NSW roadmap determinations - Guidance note - November 2024
The AER has released an updated guidance note on amending the post-tax revenue model for use in NSW non-contestable revenue determinations.
Type
Guidelines
Status
Current
NSW contribution determination guideline
The AER has updated the contribution determination guideline to introduce some minor changes to the process for NSW scheme entities to submit input data.
Type
Guidelines
Status
Current
Revenue determination guideline for NSW non-contestable projects - July 2024
The AER has reviewed the revenue determination guideline for non-contestable infrastructure projects to improve the efficiency of the process.
Type
Guidelines
Status
Current
NSW contribution determination guideline (2023) - Superseded
Our guideline explains how we determine the annual costs of the NSW electricity infrastructure roadmap that will then be recovered from consumers.
Type
Guidelines
Status
Historical
Revenue determination guideline for NSW non-contestable projects
Our guideline explains the Transmission Efficiency Test and how we determine revenue for network operators authorised to carry out non-contestable projects.
Type
Guidelines
Status
Historical
NSW contribution determination guideline (2022) - Superseded
The Contribution determination guideline (the Guideline) addresses cost recovery under the NSW Electricity Infrastructure Roadmap.
Type
Guidelines
Status
Historical
NSW Electricity Infrastructure Investment Act - 2nd jurisdictional scheme application
On 29 July 2022, the NSW Office of Energy and Climate Change (OECC) lodged an application for the AER to consider whether the scheme established under section 58(6) of the Electricity Infrastructure Investment Act 2020 (NSW) and clause 37 of the Electricity Infrastructure Investment Regulation 2021 is a jurisdictional scheme.
Type
Schemes
Status
Current
Revenue determination guideline for NSW contestable projects
Our guideline explains the Transmission Efficiency Test and how we determine revenue for network operators selected for projects through a competitive process.
Type
Guidelines
Status
Current
NSW Electricity Infrastructure Investment Act - Jurisdictional scheme application
On 11 November 2021, the NSW Department of Planning, Industry and Environment (DPIE) lodged an application for the AER to consider whether the scheme established under section 58(1) of the Electricity Infrastructure Investment Act (NSW) 2020 (the Act) is a jurisdictional scheme.
Type
Schemes
Status
Open
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2024−25
View our decision on the maximum amount electricity distributors can pass through to consumers in 2024-25 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
Transgrid - Cost Allocation Method 2023
TransGrid's cost allocation methodology (CAM) governs the manner in which TransGrid is allowed to allocate costs to the transmission services it provides.
Type
Cost allocation methods
Status
Current