Results
543 result(s), displaying 529 to 540
Waratah Super Battery – SIPS battery service
Read our determination on the amounts to be paid to Transgrid for the System Integrity Protection Scheme battery service component of the WSB project.
Type
Determinations
Status
Current
ElectraNet Mid North South Australia REZ Expansion Stage 1a - Early Works Contingent Project
On 28 March 2025, ElectraNet submitted its Mid North South Australia Renewable Energy Zone Expansion Stage 1a contingent project application to the AER.
Type
Contingent projects
Status
Open
Kurri Kurri Lateral Pipeline classification decision
On 6 December 2024, APA Group (APA) applied for a classification decision for its Kurri Kurri Lateral Pipeline (KKPL).
Type
Determinations
Status
Open
APTNT - Revocation of ring fencing exemption
The AER has made a draft decision to revoke an exemption granted to APT Pipelines NT Pty Ltd from ring-fencing requirements under the National Gas Law.
Type
Ring-fencing
Status
Current
Marinus Link - Intending transmission network application
Marinus Link intending Transmission Network Service Provider (TNSP) application and Commencement and Process Paper.
Type
Determinations
Status
Open
Powerlink Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that Powerlink can earn from customers over the period 1 July 2027 to 30 June 2032.
Type
Determinations
Status
Open
AusNet Services Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that AusNet Services can earn from customers over the period 1 April 2027 to 31 March 2032.
Type
Determinations
Status
Open
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
TasNetworks - Network support pass through 2023-24
AER’s has determined TasNetworks' 2023-24 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current
AusNet Services transmission cost pass through - 13 February 2024 storm
AusNet Services submitted a cost pass through application seeking to recover the costs it has incurred as a result of the 13 February 2024 storm in Victoria.
Type
Cost pass throughs
Status
Open