Multinet Gas - Annual tariff variation 2022
Multinet submitted to the AER an annual tariff variation notice for its Victorian gas distribution network for the period 1 January 2022 - 31 December 2022.
Type
Tariff variations
Status
Historical
APA Victorian Transmission System - Annual tariff variation 2022
APA Group submitted to the AER an annual tariff variation notice for its Victorian gas transmission network for the period 1 January 2022 - 31 December 2022.
Type
Tariff variations
Status
Historical
Reinforcing the NSW Southern Shared Network (Humelink) RIT-T dispute
On 24 November 2021 the AER published a determination clause 5.16B of the National Energy Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
TransGrid - Cost pass through - 2019–20 Bushfire season
On 13 November 2020, TransGrid submitted a cost pass through application seeking to recover costs in relation to the 2019-20 bushfires in New South Wales.
Type
Cost pass throughs
Status
Current
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20