Results
15 result(s), displaying 1 to 12
Murraylink - Connection charge pass through 2022–23
The AER published its decision on a negative cost pass through application submitted by Murraylink to reduce its 2024-25 allowed revenue due to lower than forecast connection charges in 2022-23.
Type
Cost pass throughs
Status
Current
ElectraNet - Contingent project - Heywood Interconnector upgrade
Type
Contingent projects
Status
Historical
ElectraNet - Heywood interconnector upgrade regulatory investment test - transmission (RIT-T)
Type
Contingent projects
Status
Historical
Murraylink - Determination 2023–28
Murraylink's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
Murraylink - Determination 2018-23
Murraylink's electricity transmission determination for the period 1 July 2018 to 30 June 2023
Type
Determinations
Status
Historical