Results
13 result(s), displaying 1 to 12
Essential Energy - Ring-fencing waiver - training services
Essential Energy submitted a ring-fencing waiver application under clause 5.2 of the Electricity Distribution Ring-fencing Guideline.
Type
Ring-fencing
Status
Open
Transgrid - Ring-fencing waiver (backup generation) - January 2024
Transgrid submitted a ring-fencing waiver application under clause 5.2 of the Electricity Transmission Ring-fencing Guideline.
Type
Ring-fencing
Status
Open
Central-West Orana - Renewable Energy Zone - Ring-fencing class waiver
A class waiver under the electricity distribution Ring-fencing Guideline enables DNSPs to potentially build and operate transmission infrastructure in a REZ.
Type
Ring-fencing
Status
Open
TransGrid – Expanding Victoria-New South Wales transmission transfer capacity contingent project
Type
Contingent projects
Status
Open
New South Wales: December 2026 - March 2027
The Retailer Reliability Obligation (RRO) is designed to support reliability in the National Electricity Market (NEM).
Type
Retail Reliability Obligation
Status
Open
Essential Energy - Ring-fencing waiver - technical training
Essential Energy has submitted an application for a waiver of clause 4.2 of the Ring-fencing Guideline (Electricity distribution).
Type
Ring-fencing
Status
Open
Main Central-West Orana Renewable Energy Zone network project (contestable)
The AER has received a revenue proposal from ACEREZ for the main Central-West Orana REZ network project and has commenced its assessment of the proposal.
Type
Determinations
Status
Open
Kurri Kurri Lateral Pipeline classification decision
On 6 December 2024, APA Group (APA) applied for a classification decision for its Kurri Kurri Lateral Pipeline (KKPL).
Type
Determinations
Status
Open
Essential Energy Bushfire Risk Reclassification Contingent Project
The AER's decision relating to Essential Energy's Bushfire Risk Reclassification Contingent Project
Type
Contingent projects
Status
Open
Directlink - Determination 2025–30
Directlink electricity revenue determination for the 2025–30 period.
Type
Determinations
Status
Open
Jemena Gas Networks (NSW) - Access arrangement 2025–30
The AER will make a determination on the maximum amount of revenue that Jemena Gas Networks can earn from consumers over the period 1 July 2025 to 30 June 2030.
Type
Access arrangements
Status
Open