Results
57 result(s), displaying 37 to 48
Essential Energy - Cost pass through - extension of time to submit application
Type
Cost pass throughs
Status
Current
Central-West Orana - Renewable Energy Zone - Ring-fencing class waiver
A class waiver under the electricity distribution Ring-fencing Guideline enables DNSPs to potentially build and operate transmission infrastructure in a REZ.
Type
Ring-fencing
Status
Open
AusNet Services - Cost pass through - Easement land tax 2022–23
Type
Cost pass throughs
Status
Current
Ergon Energy - Ring-fencing waiver (streamlined process) - March 2022
Type
Ring-fencing
Status
Current
AusNet Services - Annual tariff variation 2022
AusNet Services submitted to the AER an annual tariff variation notice for its Victorian gas distribution network for the period 1 January 2022-31 December 2022
Type
Tariff variations
Status
Historical
Australian Gas Networks (Victoria and Albury) - Annual tariff variation 2022
AGN submitted to the AER an annual tariff variation notice for its Victorian gas distribution network for the period 1 January 2022 - 31 December 2022.
Type
Tariff variations
Status
Historical
Multinet Gas - Annual tariff variation 2022
Multinet submitted to the AER an annual tariff variation notice for its Victorian gas distribution network for the period 1 January 2022 - 31 December 2022.
Type
Tariff variations
Status
Historical
APA Victorian Transmission System - Annual tariff variation 2022
APA Group submitted to the AER an annual tariff variation notice for its Victorian gas transmission network for the period 1 January 2022 - 31 December 2022.
Type
Tariff variations
Status
Historical
Energex and Ergon Energy - Regulatory accounts Ring-fencing waiver 2011
Type
Ring-fencing
Status
Historical
ElectraNet - Contingent project Adelaide central reinforcement 2009
Type
Contingent projects
Status
Historical