ElectraNet - Cost pass through - 2022–23 Inertia network service
Type
Cost pass throughs
Status
Open
Essential Energy - Cost pass through - extension of time to submit application
Type
Cost pass throughs
Status
Current
Central-West Orana - Renewable Energy Zone - Ring-fencing class waiver
A class waiver under the electricity distribution Ring-fencing Guideline enables DNSPs to potentially build and operate transmission infrastructure in a REZ.
Type
Ring-fencing
Status
Open
AusNet Services - Cost pass through - Easement land tax 2022–23
Type
Cost pass throughs
Status
Current
Ergon Energy - Ring-fencing waiver (streamlined process) - March 2022
Type
Ring-fencing
Status
Current
AusNet Services - Annual tariff variation 2022
AusNet Services submitted to the AER an annual tariff variation notice for its Victorian gas distribution network for the period 1 January 2022-31 December 2022
Type
Tariff variations
Status
Historical
Australian Gas Networks (Victoria and Albury) - Annual tariff variation 2022
AGN submitted to the AER an annual tariff variation notice for its Victorian gas distribution network for the period 1 January 2022 - 31 December 2022.
Type
Tariff variations
Status
Historical
Multinet Gas - Annual tariff variation 2022
Multinet submitted to the AER an annual tariff variation notice for its Victorian gas distribution network for the period 1 January 2022 - 31 December 2022.
Type
Tariff variations
Status
Historical
APA Victorian Transmission System - Annual tariff variation 2022
APA Group submitted to the AER an annual tariff variation notice for its Victorian gas transmission network for the period 1 January 2022 - 31 December 2022.
Type
Tariff variations
Status
Historical
Reinforcing the NSW Southern Shared Network (Humelink) RIT-T dispute
On 24 November 2021 the AER published a determination clause 5.16B of the National Energy Rules.
Type
RIT-T and RIT-D disputes
Status
Historical