Results
90 result(s), displaying 73 to 84
Evoenergy (ActewAGL) gas network - Annual tariff variation 2018-19
Type
Tariff variations
Status
Historical
AusNet Services - Cost pass through - easement land tax 2018–19
Type
Cost pass throughs
Status
Historical
Power and Water – Cost pass through – extension of time limit to submit 2018 application
Type
Cost pass throughs
Status
Current
Transgrid - Determination 2023–28
Transgrid's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
APA Victorian Transmission System - Access arrangement 2023–27
Type
Access arrangements
Status
Current
Jemena - Determination 2021-26
In 2024 Jemena applied to the AER to revoke and substitute its distribution determination for the 2021-26 regulatory control period.
Type
Determinations
Status
Open