Overview

Revised proposal

On 8 January 2019, Ausgrid submitted its revised regulatory proposal for the period, 1 July 2019 to 30 June 2024.

Models

Ausgrid has also submitted cost benefit analysis modelling files (spreadsheets) which are too large for us to publish on our website. The files relate to the poles program (Attachment 5.13.M.1A), the low voltage CONSAC & HDPE program (Attachment 5.13.M.2A), circuit breakers excluding switchboards program (Attachment 5.13.M.7A), the high voltage fuse switches program (Attachment 5.13.M.8A), the distribution substations program (Attachment 5.13.M.9A), the low voltage underground reactive program (Attachment 5.13.M.10A), the pole top substations program (Attachment 5.13.M.11A), and the high voltage drop-out program (Attachment 5.13.M.16A). We can provide these files on request. Please email Ausgrid20192019-24ataer [dot] gov [dot] au (subject: Revised%20proposal%20-%20request%20for%20Ausgrid%20modelling%20file%28s%29) (Ausgrid2019[at]aer[dot]gov[dot]au (link sends e-mail)) if you would like a copy of these files.

Supporting information

Ausgrid has also submitted a spreadsheet file containing an extract from the CASS Database which is too large for us to publish on our website (Attachment 11.03 - Extract from CASS Database). We can provide this file on request. Please email Ausgrid20192019-24ataer [dot] gov [dot] au (subject: Revised%20proposal%20-%20request%20for%20Ausgrid%20modelling%20file%28s%29) (Ausgrid2019[at]aer[dot]gov[dot]au (link sends e-mail)(link sends e-mail)) if you would like a copy of this file.

Submissions

-

Submissions on our draft decision and Ausgrid's revised regulatory proposal for the 2019-24 regulatory control period closed on 5 February 2019.

CCP10 - Submission of Ausgrid 2019-24 draft decision and revised proposal - January 2019

Download
Authors
Consumer Challenge Panel (CCP)
Content type
Document

ECA - Submission on Ausgrid 2019-24 draft decision and revised proposal - February 2019

Download
Authors
Energy Consumers Australia (ECA)
Content type
Document

ETU NSW - Submission on Ausgrid 2019-24 draft decision and revised proposal - February 2019

Download
Authors
Electrical Trades Union (ETU)
Content type
Document

EUAA - Submission on NSW 2019-24 draft decisions and revised proposals - February 2019

Download
Authors
Energy Users Association of Australia (EUAA)
Content type
Document

PIAC - Submission on NSW 2019-24 draft decisions and revised proposals - February 2019

Download
Authors
Public Interest Advocacy Centre (PIAC)
Content type
Document

SSROC - Submission on Ausgrid 2019-24 draft decision and revised propsoal - February 2019

Download
Authors
Southern Sydney Regional Organisation of Councils (SSROC)
Content type
Document

Consultation - Opex productivity growth forecast review outcome

On 8 March 2019, we published our final decision paper for our operating expenditure productivity growth forecast review. We decided that a 0.5 per cent annual operating expenditure productivity growth rate reflects a reasonable forecast of the productivity growth a prudent and efficient distributor can make.

As flagged in our draft and final decision papers for that review, we propose to adopt this operating expenditure productivity growth forecast when making our final decision for Ausgrid's 2019-24 distribution determination. We have written to Ausgrid about the impact of our productivity growth decision on our assessment of its revised opex proposal.