Results
15952 result(s), displaying 15925 to 15936
Ergon Energy - Determination 2025–30
Ergon Energy electricity revenue determination for the 2025–30 period
Type
Determinations
Status
Open
Retail performance reporting procedures and guidelines (2024 update)
The AER has released its final decision on its Retail performance reporting procedures and guidelines for retailers and distributors.
Type
Guidelines
Status
Current
Default market offer prices 2025–26
The DMO is a maximum price that retailers can charge electricity customers on default contracts known as standing offer contracts.
Type
Reviews
Status
Open
Powerlink Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that Powerlink can earn from customers over the period 1 July 2027 to 30 June 2032.
Type
Determinations
Status
Open
AusNet Services Transmission - Determination 2027-2032
The AER will make a determination of the maximum amount of revenue that AusNet Services can earn from customers over the period 1 April 2027 to 31 March 2032.
Type
Determinations
Status
Open
PARKSTONE RETAIL NO. 1 PTY LTD - Hinkler Central network exemption
PARKSTONE RETAIL NO. 1 PTY LTD - Hinkler Central network exemption
Type
Network exemptions
Status
Current
South Australia: December 2026 - February 2027
In its September 2023 update to the 2023 ESOO AEMO has forecast a 205 MW reliability gap in South Australia in 2026–27.
Type
Retail Reliability Obligation
Status
Open
Evoenergy - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Evoenergy can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APT Pipelines (NT) (APTNT) can earn from its Amadeus transmission gas pipeline from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that Australian Gas Networks (SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Jemena VEBM cost pass through application
Jemena’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open
Powercor VEBM cost pass through application
Powercor’s Victorian Emergency Backstop Mechanism (VEBM) cost pass through application
Type
Cost pass throughs
Status
Open