Results
12490 result(s), displaying 12469 to 12480
APTNT - Revocation of ring fencing exemption
The AER has made a draft decision to revoke an exemption granted to APT Pipelines NT Pty Ltd from ring-fencing requirements under the National Gas Law.
Type
Ring-fencing
Status
Current
Ergon Energy Ring-fencing Waiver - Field Services for Powerlink - October 2024
Ergon Energy Network is requesting a ring-fencing waiver in order to provide field services to Powerlink
Type
Ring-fencing
Status
Current
Power and Water Corporation - Determination 2024–29
Power and Water Corporation electricity revenue determination 2024-29
Type
Determinations
Status
Current
Ausgrid - Determination 2024–29
Ausgrid electricity revenue determination for the 2024–29 period
Type
Determinations
Status
Current
Evoenergy (ActewAGL) - Determination 2024–29
Evoenergy revenue determination for the 2024–29 period
Type
Determinations
Status
Current
Basslink - Determination 2025–30
On 15 September 2023, APA Group submitted additional information in support of the conversion application and a revenue determination proposal.
Type
Determinations
Status
Current
PARKSTONE RETAIL NO. 1 PTY LTD - Hinkler Central network exemption
PARKSTONE RETAIL NO. 1 PTY LTD - Hinkler Central network exemption
Type
Network exemptions
Status
Current
REAL UTILITIES FORTITUDE VALLEY PTY LIMITED - BRUNSWICK & CO network exemption
The Registrant’s exemption from the requirement to register as a network service provider and the operation of Chapter 5 of the NER has now come into effect.
Type
Network exemptions
Status
Current
Retail performance reporting procedures and guidelines (2024 update)
The AER has released its final decision on its Retail performance reporting procedures and guidelines for retailers and distributors.
Type
Guidelines
Status
Current
TasNetworks - Network support pass through 2023-24
AER’s has determined TasNetworks' 2023-24 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current