Results
527 result(s), displaying 301 to 312
TransGrid - Network support pass through 2019–20 and 2020–21
Type
Cost pass throughs
Status
Historical
ElectraNet - Cost pass through - 2022–23 Inertia network service
Type
Cost pass throughs
Status
Open
Tallawarra Pipeline also known as Tallawarra Lateral
Type
Non-scheme pipeline exemptions
Status
Current
Tallawarra Lateral Pipeline
Type
Capacity Trading Platform and Day Ahead Auction exemptions
Status
Current
AusNet Services - Cost pass through - Easement land tax 2022–23
Type
Cost pass throughs
Status
Current
Trustee for the Lin Brothers Trust - 139 Coronation Drive retail exemption
Type
Network exemptions
Status
Current
APA Victorian Transmission System - Annual tariff variation 2022
APA Group submitted to the AER an annual tariff variation notice for its Victorian gas transmission network for the period 1 January 2022 - 31 December 2022.
Type
Tariff variations
Status
Historical