Results
533 result(s), displaying 313 to 324
ElectraNet - Cost pass through - 2022–23 Inertia network service
Type
Cost pass throughs
Status
Open
Tallawarra Pipeline also known as Tallawarra Lateral
Type
Non-scheme pipeline exemptions
Status
Current
Tallawarra Lateral Pipeline
Type
Capacity Trading Platform and Day Ahead Auction exemptions
Status
Current
AusNet Services - Cost pass through - Easement land tax 2022–23
Type
Cost pass throughs
Status
Current
Trustee for the Lin Brothers Trust - 139 Coronation Drive retail exemption
Type
Network exemptions
Status
Current
APA Victorian Transmission System - Annual tariff variation 2022
APA Group submitted to the AER an annual tariff variation notice for its Victorian gas transmission network for the period 1 January 2022 - 31 December 2022.
Type
Tariff variations
Status
Historical
Reinforcing the NSW Southern Shared Network (Humelink) RIT-T dispute
On 24 November 2021 the AER published a determination clause 5.16B of the National Energy Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
TransGrid – Expanding Victoria-New South Wales transmission transfer capacity contingent project
Type
Contingent projects
Status
Open
TransGrid - Cost pass through - 2019–20 Bushfire season
On 13 November 2020, TransGrid submitted a cost pass through application seeking to recover costs in relation to the 2019-20 bushfires in New South Wales.
Type
Cost pass throughs
Status
Current
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20
Type
Cost pass throughs
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2021-22
Type
Tariff variations
Status
Historical