Results
563 result(s), displaying 457 to 468
ElectraNet - Determination 2023–28
ElectraNet's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
Marinus Link - Determination 2025-28 - Stage 1, Part A (Early works)
The AER’s role is to review the reasonableness of the proposed costs of the Marinus Link interconnector to ensure consumers pay no more than necessary.
Type
Determinations
Status
Open
New South Wales: December 2025 - February 2026
The AER has made a T-3 Reliability Instrument under the RRO for a forecast reliability gap in New South Wales, from 1 December 2025-28 February 2026.
Type
Retail Reliability Obligation
Status
Revoked
APA Victorian Transmission System - Access arrangement 2023–27
Type
Access arrangements
Status
Current
Roma (Wallumbilla) to Brisbane Pipeline - Access arrangement 2017-22
Type
Access arrangements
Status
Historical
APA Victorian Transmission System - Access Arrangement 2018-22
Gas access arrangement for the period 1 January 2018 to 31 December 2022 for the APA Victorian Transmission System 2018-2022
Type
Access arrangements
Status
Historical
TransGrid - Determination 2018-23
Transgrid's electricity transmission determination for the period 1 July 2018 to 30 June 2023
Type
Determinations
Status
Historical
Murraylink - Determination 2018-23
Murraylink's electricity transmission determination for the period 1 July 2018 to 30 June 2023
Type
Determinations
Status
Historical
ElectraNet - Determination 2018-23
ElectraNet's electricity transmission determination for the period 1 July 2018 to 30 June 2023
Type
Determinations
Status
Historical