Results
17 result(s), displaying 1 to 12
Guidelines to make the integrated system plan actionable
The Australian Energy Regulator (AER) has developed guidelines to make the integrated system plan (ISP) actionable
Type
Guidelines
Status
Historical
RIT-T and RIT-D application guidelines 2018
The RIT is a cost benefit analysis that network businesses must perform and consult on before making major investments in their networks
Type
Guidelines
Status
Historical
Post-tax revenue models (transmission and distribution) - January 2015 amendment
Type
Models
Status
Historical
Service target performance incentive scheme version 4.1 - September 2014 amendment
Type
Schemes
Status
Historical
Priorities and objectives of electricity network service provider performance reports 2011
Type
Guidelines
Status
Historical
Review of electricity transmission service standards incentive schemes
The AER is reviewing of aspects of the service target performance incentive scheme (STPIS) for transmission network service providers
Type
Reviews
Status
Open
ElectraNet - Contingent project - Heywood Interconnector upgrade
Type
Contingent projects
Status
Historical
ElectraNet - Heywood interconnector upgrade regulatory investment test - transmission (RIT-T)
Type
Contingent projects
Status
Historical
Murraylink - Determination 2018-23
Murraylink's electricity transmission determination for the period 1 July 2018 to 30 June 2023
Type
Determinations
Status
Historical