Results
2178 result(s), displaying 2161 to 2172
Jemena - Ring Fencing Decision - Phillip Creek Compressor Station
The AER has made a final decision to grant exemptions to Jemena from their ring-fencing obligations for the Phillip Creek Compressor Station.
Type
Ring-fencing
Status
Current
Power and Water Corporation - Determination 2024–29
Power and Water Corporation electricity revenue determination 2024-29
Type
Determinations
Status
Current
ElectraNet Mid North South Australia REZ Expansion Stage 1a - Early Works Contingent Project
On 28 March 2025, ElectraNet submitted its Mid North South Australia Renewable Energy Zone Expansion Stage 1a contingent project application to the AER.
Type
Contingent projects
Status
Open
APTNT - Revocation of ring fencing exemption
The AER has made a draft decision to revoke an exemption granted to APT Pipelines NT Pty Ltd from ring-fencing requirements under the National Gas Law.
Type
Ring-fencing
Status
Current
South Australia: December 2026 - February 2027
In its September 2023 update to the 2023 ESOO AEMO has forecast a 205 MW reliability gap in South Australia in 2026–27.
Type
Retail Reliability Obligation
Status
Open
Australian Gas Networks (SA) - Access arrangement 2026-31
The AER will make a determination on the maximum amount of revenue that AGN(SA) can earn from consumers over the period 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Amadeus Gas Pipeline - Access arrangement 2026–31
The AER will make a determination on the maximum amount of revenue that APA's Amadeus gas pipeline can earn from consumers over 1 July 2026 to 30 June 2031.
Type
Access arrangements
Status
Open
Retail performance reporting procedures and guidelines (2024 update)
The AER has released its final decision on its Retail performance reporting procedures and guidelines for retailers and distributors.
Type
Guidelines
Status
Current
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current