Results
9 result(s), displaying 1 to 9
TasNetworks - Network support pass through 2022-23
TasNetworks - Network support pass through 2022-23
Type
Cost pass throughs
Status
Current
TasNetworks - Cost pass through - extension of time to submit application
Type
Cost pass throughs
Status
Current
TasNetworks - Determination 2024–29
TasNetworks electricity revenue determination for the 2024–29 period
Type
Determinations
Status
Current
Basslink - Determination 2025–30
On 15 September 2023, APA Group submitted additional information in support of the conversion application and a revenue determination proposal.
Type
Determinations
Status
Current
Ring-fencing guideline (electricity transmission) 2025
The AER has released version 5 of the ring-fencing guideline for electricity transmission.
Type
Ring-fencing
Status
Current
TasNetworks - Network support pass through 2023-24
AER’s has determined TasNetworks' 2023-24 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current