Results
42 result(s), displaying 1 to 12
Victoria to NSW Interconnector West (VNI West) RIT-T dispute
On 16 October 2023 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
APA Victorian Transmission System - Annual tariff variation 2022
APA Group submitted to the AER an annual tariff variation notice for its Victorian gas transmission network for the period 1 January 2022 - 31 December 2022.
Type
Tariff variations
Status
Historical
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20
Type
Cost pass throughs
Status
Historical
APA Victorian Transmission System - Annual tariff variation 2021
Type
Tariff variations
Status
Historical
APA Victorian Gas Transmission System - Annual tariff variation 2020
Type
Tariff variations
Status
Historical
APA Victorian Transmission System - Annual tariff variation 2019
Type
Tariff variations
Status
Historical
AusNet Services - Cost pass through - easement land tax 2018–19
Type
Cost pass throughs
Status
Historical
APA Victorian Transmission System - Annual tariff variation 2018
Type
Tariff variations
Status
Historical
AusNet Services - Cost pass through - easement land tax 2017-18
Type
Cost pass throughs
Status
Historical
APA VTS (formerly APA GasNet) - Annual tariff variation 2017
Type
Tariff variations
Status
Historical
AusNet Services - Cost pass through - easement land tax 2016
Type
Cost pass throughs
Status
Historical