Results
11 result(s), displaying 1 to 11
Powerlink - Network support pass through 2022–23
Powerlink - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Roma to Brisbane Pipeline - 2024–25 tariff variation notice
Roma to Brisbane proposed new network prices to apply to its Qld gas pipeline for 2024–25.
Type
Tariff variations
Status
Current
TransGrid - Expanding NSW-QLD Transmission Transfer Capacity regulatory investment test - transmission (RIT-T)
Type
Contingent projects
Status
Current
Roma (Wallumbilla) to Brisbane Pipeline - Access arrangement 2022–27
Type
Access arrangements
Status
Current
Ring-fencing guideline (electricity transmission) 2025
The AER has released version 5 of the ring-fencing guideline for electricity transmission.
Type
Ring-fencing
Status
Current
Jemena - Ring Fencing Decision - Phillip Creek Compressor Station
The AER has made a final decision to grant exemptions to Jemena from their ring-fencing obligations for the Phillip Creek Compressor Station.
Type
Ring-fencing
Status
Current
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current