Results
12 result(s), displaying 1 to 12
Murraylink - Determination 2023–28
Murraylink's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
ElectraNet - Determination 2023–28
ElectraNet's current electricity transmission determination applies from 1 July 2023 to 30 June 2028.
Type
Determinations
Status
Current
Murraylink - Determination 2018-23
Murraylink's electricity transmission determination for the period 1 July 2018 to 30 June 2023
Type
Determinations
Status
Historical
ElectraNet - Determination 2018-23
ElectraNet's electricity transmission determination for the period 1 July 2018 to 30 June 2023
Type
Determinations
Status
Historical
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current