Results
13 result(s), displaying 1 to 12
Ergon Energy - Ring-fencing waiver - Behind the meter - August 2024
Ergon Energy waiver to install, own, operate and maintain distributed energy resources behind participating customers’ meters in isolated networks in Queensland
Type
Ring-fencing
Status
Current
TasNetworks - Network support pass through 2022-23
TasNetworks - Network support pass through 2022-23
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2022–23
Powerlink - Network support pass through 2022–23
Type
Cost pass throughs
Status
Current
Ergon Energy - Ring-fencing waiver - competitive services
On 25 July 2023, Ergon Energy submitted to the AER a ring-fencing waiver application from clauses 3.1(b) and 4.2.3 of the Ring-fencing Guideline (Electricity distribution).
Type
Ring-fencing
Status
Open
Energex - Annual pricing 2023–24
Energex submitted to the AER an annual pricing proposal for its Queensland distribution network for the period 1 July 2023 to 30 June 2024.
Type
Pricing proposals
Status
Historical
Ergon Energy - Annual pricing 2023–24
Ergon Energy submitted to the AER an annual pricing proposal for its Queensland distribution network for the period 1 July 2023 to 30 June 2024.
Type
Pricing proposals
Status
Historical
TasNetworks - Annual pricing 2023–24
TasNetworks submitted to the AER an annual pricing proposal for its Tasmanian distribution network for the period 1 July 2023 to 30 June 2024.
Type
Pricing proposals
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2023–24
APA Group submitted to the AER an annual tariff variation notice for its Queensland gas transmission network for the period 1 July 2023 to 30 June 2024.
Type
Tariff variations
Status
Historical
Marinus Link - Determination 2025-28 - Stage 1, Part A (Early works)
The AER’s role is to review the reasonableness of the proposed costs of the Marinus Link interconnector to ensure consumers pay no more than necessary.
Type
Determinations
Status
Open
Ergon Energy – Ring-fencing waiver (streamlined process) – December 2023
On 4 December 2023 the AER granted a waiver for Ergon Energy, with conditions.
Type
Ring-fencing
Status
Current
Energex – Ring-fencing waiver (streamlined process) – December 2023
On 4 December 2023 the AER granted a waiver for Energex, with conditions.
Type
Ring-fencing
Status
Current
Marinus Link - Intending transmission network application
Marinus Link intending Transmission Network Service Provider (TNSP) application and Commencement and Process Paper.
Type
Determinations
Status
Open