Results
12 result(s), displaying 1 to 12
TransGrid - Network support pass through 2019–20 and 2020–21
Type
Cost pass throughs
Status
Historical
APA Victorian Transmission System - Annual tariff variation 2022
APA Group submitted to the AER an annual tariff variation notice for its Victorian gas transmission network for the period 1 January 2022 - 31 December 2022.
Type
Tariff variations
Status
Historical
Reinforcing the NSW Southern Shared Network (Humelink) RIT-T dispute
On 24 November 2021 the AER published a determination clause 5.16B of the National Energy Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
Roma to Brisbane Pipeline - Annual tariff variation 2021-22
Type
Tariff variations
Status
Historical
AusNet Services - Cost pass through - Easement land tax 2021–22
Type
Cost pass throughs
Status
Current
TasNetworks - Determination 2024–29
TasNetworks electricity revenue determination for the 2024–29 period
Type
Determinations
Status
Current
South Australia: January - February 2024
On 12 March 2024, AEMO notified the AER that there were no compliance trading intervals during the 8 Janaury-29 February 2024 reliability gap period in South Australia. This notice brings this reliability instrument to a close.
Type
Retail Reliability Obligation
Status
Historical