Owner
Queensland Government
Covered by regulation
Yes
Source
State of the Energy Market 2014
Current regulatory period: 1 July 2012 - 30 June 2017
Line length (km) |
Electricity transmitted 2012-13 (GWh) |
Asset base June 2013 ($million) |
14 310 |
49 334 |
6 035 |
Decisions
The AER will make a determination of the maximum amount of revenue that Powerlink can earn from customers over the period 1 July 2027 to 30 June 2032.
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Powerlink - Network support pass through 2022–23
Type
Cost allocation methods
Reports
Powerlink network information - RIN responses
Our network performance reports presents our latest electricity and gas networks performance within regulatory frameworks.
Transmission performance data 2006-2018