On 22 March 2024, the AER published its determination on SA Power Networks’ cost pass through application to recover costs incurred as a result of flooding of the South Australian section of the River Murray between November 2022 and February 2023.
Our decision is to approve a positive pass through amount for SA Power Networks of $11.2 million (nominal, smoothed), to be recovered in 2024-25.