The Central-West Orana (CWO) REZ is approximately 20,000 square kilometres located in central NSW and centred by Dubbo and Dunedoo. It is designed to initially deliver 4.5 gigawatts of network capacity utilising generation from solar, wind and energy storage, with capacity to increase to 6 GW by 2038.
The CWO REZ was declared by the NSW Minister for Energy and Environment under section 19(1) of the Electricity Infrastructure Investment Act (EII Act) in November 2021. The declaration was amended in December 2023.