The Registrant’s exemption from the requirement to register as a network service provider and the operation of Chapter 5 of the NER has now come into effect. The exemption was granted under clause 2.5.1 of the NER in accordance with the AER’s Electricity NSP Registration Exemption Guideline (Network Exemption Guideline), and is subject to a number of conditions.
You can find the most recent version of the Network Exemption Guideline on the Network exemptions page.
Exemption class applicable conditions
The registrant confirms that this site is a greenfield site. For more information, refer to the Network Exemption Guideline linked to above.
Before 7 November 2018 exemption for this site was registered by Vision Centre Gold Coast CTS 29190 / ABN 19 427 176 079.
Before 16 October 2023 exemption for this site was registered by Savant Energy Power Networks Pty Ltd / ABN 31 604 736 638.