On 28 June 2019, ElectraNet submitted an application to the AER seeking a determination that funding for the Main Grid System Strength contingent project be approved and their maximum allowed revenue be adjusted in accordance with clause 6A.8.2 of the NER. The Main Grid System Strength project entails installing four high-inertia synchronous condensers to address a system strength gap in South Australia that the Australian Energy Market Operator (AEMO) declared in December 2016 and confirmed in September 2017.
On this page
Application
ElectraNet - Cover Letter - Main Grid System Strength Contingent Project - 28 June 2019
Download
Content type
Document
ElectraNet - Contingent Project Application - Main Grid System Strength - 28 June 2019
Download
Content type
Document
Supporting information
GHD Advisory - MGSS Contingent Project - Economic Life Advice - 28 June 2019
Download
Content type
Document
AEMO - Letter to ElectraNet - Technical Approval of Solution - 8 March 2019
Download
Content type
Document
ElectraNet - ElectraNet - Response to AER information request (redacted) - 19 July 2019
Download
Content type
Document
ElectraNet - Response to AER information request - Attachment - Synchronous Condenser Technical Specification - 19 July 2019
Download
Content type
Document
Submissions
-
Submissions on ElectraNet's contingent project application closed 15 July 2019.
Business SA - Submission on ElectraNet Main Grid System Strength contingent project - 15 July 2019
Download
Content type
Document
EnergyAustralia - Submission on ElectraNet Main Grid System Strength contingent project - 15 July 2019
Download
Content type
Document
SACOSS - Submission on ElectraNet Main Grid System Strength contingent project - 12 July 2019