The AER released a draft decision on the Essential Energy (Country Energy), AusGrid (EnergyAustralia) and Endevour Energy (Integral Energy) distribution determinations for the regulatory control period 1 July 2009 to 30 June 2014 on 28 November 2008.
The draft decision establishes the basis for determining NSW distribution network charges in the 2009-2014 regulatory control period.