Overview

Draft decision

On 6 July 2021, we published our draft Distributed Energy Resources (DER) Integration Expenditure guidance note and explanatory statement.

Submissions

-

We invited written submissions on the draft guidance note and its explanatory statement. Submissions closed on 31 August 2021.

CEC - Submission on draft DER integration expenditure guidance note - August 2021

Download
Authors
Clean Energy Council (CEC)
Content type
Document

ECA - Submission on draft DER integration expenditure guidance note - September 2021

Download
Authors
Energy Consumers Australia (ECA)
Strategen Consulting (Australia) Pty Ltd
Content type
Document

ENA - Submission on draft DER integration expenditure guidance note - August 2021

Download
Authors
Energy Networks Australia (ENA)
Content type
Document

PIAC - Submission on draft DER integration expenditure guidance note - August 2021

Download
Authors
Public Interest Advocacy Centre (PIAC)
Content type
Document

SAPN - Submission on draft DER integration expenditure guidance note - August 2021

Download
Authors
SA Power Networks
Content type
Document

Stakeholder forum

On 5 August 2021 the AER held an online public forum where interested stakeholders participated and provided their views on the draft guidance note. The presentation slide pack is now available. 

AER - Online forum - DER integration expenditure guidance note presentations

Download
Authors
AER
SA Power Networks
Consumer Challenge Panel
Content type
Document