Submissions closed 16 October 2012. The AER must publish a final determination within 5 weeks of the close of submissions.
Submissions - to draft determination
Grid Australia - Submission on RIT-T Cost Thresholds review draft determination - 16 October 2012
Download
Content type
Document
Draft determination - Cost thresholds review for the Regulatory Investment Test for Transmission
On 11 September 2012 the AER published a draft determination.
AER RIT-T cost thresholds review draft determination - September 2012
Content type
Document