Project timeline

Overview

Draft guideline

On 19 March 2020 the AER released the draft Retailer Reliability Obligation - Opt-in Guideline for consultation and a draft decision which responds to stakeholder comments on the issues paper previously released.

Submissions

-

Interested parties were invited to make a submission on the draft Retailer Reliability Obligation - Opt-in Guideline by 9 April 2020.

ENGIE - Submission - Draft Opt-In Guideline - April 2020

Download
Authors
ENGIE
Content type
Document

ERM Power Retail - Submission - Draft Opt-In Guideline - April 2020

Download
Authors
ERM Power Retail Pty Ltd
Content type
Document

MEU - Submission - Draft Opt-In Guideline - April 2020

Download
Authors
Major Energy Users Inc (MEU)
Content type
Document