Overview

Notice of draft instrument

On 4 April 2019 the AER released the Draft Interim Reliability Instrument Guidelines for consultation.

Submissions

Interested parties were invited to make a submission on the Draft Interim Reliability Instrument Guideline by 24 April 2019.

AEC - Submission - Draft Interim Reliability Instrument Guidelines - April 2019

Download
Authors
Australian Energy Council (AEC)
Content type
Document

EUAA - Submission - Draft Interim Reliability Instrument Guidelines - April 2019

Download
Authors
Energy Users Association of Australia (EUAA)
Content type
Document

Meridian Energy Australia - Submission - Draft Interim Reliability Instrument Guidelines - April 2019

Download
Authors
Meridian Energy Australia
Powershop Australia Pty Ltd
Content type
Document

Stanwell - Submission - Draft Interim Reliability Instrument Guidelines - April 2019

Download
Authors
Stanwell Corporation Limited
Content type
Document

Stakeholder forum

A workshop was held on 31 May 2019.