Overview

Issues paper - and AER's preliminary positions to the connection charge guideline for accessing the electricity distribution network

Submissions - to proposed connection charge guideline

Submissions closed 5 August 2011.

CitiPower and Powercor (VIC) - submission to connection charge guideline - 5 August 2011

Download
Authors
Powercor Australia
CitiPower
Content type
Document

Department for Transport, Energy and Infrastructure (SA) - submission to connection charge guideline - 4 August 2011

Download
Authors
Department for Transport, Energy and Infrastructure - Energy Division - SA
Content type
Document

EWON (NSW) - submission to connection charge guideline - 5 August 2011

Download
Authors
Energy and Water Ombudsman of NSW (EWON)
Content type
Document

MEU - submission to connection charge guideline - 5 August 2011

Download
Authors
Major Energy Users Inc (MEU)
Content type
Document

Origin Energy - submission to connection charge guideline - 4 August 2011

Download
Authors
Origin Energy
Content type
Document

Seed - submission to connection charge guideline - 2 August 2011

Download
Authors
Seed Advisory
Content type
Document

United Energy (VIC) - submission to connection charge guideline - 5 August 2011

Download
Authors
United Energy Distribution
Content type
Document

Late submissions

Department of Climate Change and Energy Efficiency - submission to connection charge guideline - 1 September 2011

Download
Authors
Department of Climate Change and Energy Efficiency (DCCEE)
Content type
Document

EWOV (VIC) - submission to connection charge guideline - 8 August 2011

Download
Authors
Energy and Water Ombudsman of Victoria (EWOV)
Content type
Document

Stakeholder forum

The AER hosted a public forum on 11 July 2011 to explain the issues identified in the issues and preliminary positions paper. The purpose of the forum was to facilitate stakeholders in preparing their submissions to the AER.

Public forum slides - 11 July 2011

Download
Authors
AER
Content type
Document