On 29 September 2023, we published a draft decision on Transgrid’s 2024–29 revenue determination for the non-contestable component of the Waratah Super Battery (WSB) project.
Project timeline
On this page
Draft decision
AER - Transgrid 2024-29 - Draft Decision - WSB project (Non-contestable) - September 2023
Download
Content type
Document
Models
AER - Transgrid 2024-29 - Draft Decision - WSB project (Non-contestable) - PTRM - September 2023 - PUBLIC
Download
Content type
Document
AER - Transgrid 2024-29 - Draft Decision - WSB project (Non-contestable) - capex forecast model - September 2023 - PUBLIC
Download
Content type
Document
AER - Transgrid 2024-29 - Draft Decision - WSB project (Non-contestable) - opex forecast model - September 2023 - PUBLIC
Download
Content type
Document
Submissions
-
Transgrid submitted a revised proposal in response to this draft decision.
Stakeholders were invited to make submissions on both our draft decision and Transgrid’s revised proposal by 24 November 2023.
Consumer Challenge Panel - Submission - 24 November 2023
Submission from David Prins of the Consumer Challenge Panel on our draft decision for the Waratah Super Battery non-contestable determination and Transgrid's revised proposal
Download
Content type
Document
EUAA - Submission - 24 November 2023
Submission from EUAA on our draft decision for the Waratah Super Battery non-contestable determination and Transgrid's revised proposal
Download
Content type
Document
PIAC - Submission - 24 November 2023
PIAC submission on our draft decision and Transgrid's 2024-2029 revised proposal for the non-contestable components of the Waratah Super Battery.
Download
Content type
Document
Energy Australia - Submission - 24 November 2023
EnergyAustralia submission on the AER's draft decision and Transgrid's 2024-29 revised proposal
Download
Content type
Document