Overview

Final decision

On 5 June 2020 we released our final decision on Energex's electricity distribution determination for the 2020–25 regulatory control period. Our final decision is set out in the overview and accompanying attachments. As a number of issues were settled at the draft decision stage or required only minor updates, we have not prepared all attachments. In these circumstances our draft decision reasons form part of this final decision.

Fact sheet - Energex revenue decision 2020–25 - June 2020

Download
Authors
AER
Content type
Document

Consultant reports

Reports commissioned by the AER in preparing our final decision for Energex

Models

AER final decision models for Energex

Update - Legacy tariff review

Our final decision on Energex's 2020–25 TSS proposal required Energex to undertake a review of a small number of legacy tariffs inadvertently excluded from its TSS proposal. The initial deadline for a report of this review to be submitted to us was 31 December 2020 but we granted an extension to 26 February 2021.

In line with our final decision, Energex submitted its legacy tariff review report on 26 February 2021. We have assessed the report and are satisfied with Energex's review.

Energex - Legacy tariff review report - March 2021

Download
Authors
Energex
Content type
Document

Update - Control mechanisms

On 26 November 2021, the AER revoked and substituted the 2020–25 determination for Energex to correct an error in the control mechanisms attachment to facilitate an appropriate transition from the previous version of the service target performance incentive scheme (STPIS 1.2) to its latest version (STPIS 2.0).

All other aspects of the determination remain as per the AER’s final determination which was originally made on 5 June 2020.