Results
694 result(s), displaying 205 to 216
Australian Gas Networks (Victoria and Albury) - Annual tariff variation 2020
Type
Tariff variations
Status
Historical
AusNet Services (Distribution) - Cost allocation method 2019
Type
Cost allocation methods
Status
Current
AusNet Services (Transmission) - Cost allocation method 2019
Type
Cost allocation methods
Status
Current
AusNet Services - Contingent project - installation of Rapid Earth Fault Current Limiters - tranche 3
Type
Contingent projects
Status
Current
ElectraNet - Main grid system strength contingent project
On 9 August 2019, the AER made a final decision in relation to ElectraNet's main grid system strength contingent project application.
Type
Contingent projects
Status
Current