Results
34 result(s), displaying 1 to 12
Victoria to NSW Interconnector West (VNI West) RIT-T dispute
On 16 October 2023 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
Transgrid - Cost Allocation Method 2023
TransGrid's cost allocation methodology (CAM) governs the manner in which TransGrid is allowed to allocate costs to the transmission services it provides.
Type
Cost allocation methods
Status
Current
North West Slopes and Bathurst, Orange and Parkes RIT-T disputes
On 29 November 2022 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
Reinforcing the NSW Southern Shared Network (Humelink) RIT-T dispute
On 24 November 2021 the AER published a determination clause 5.16B of the National Energy Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
CitiPower, Powercor, United Energy - Cost Allocation Method 2020
Type
Cost allocation methods
Status
Current
AusNet Services (Distribution) - Cost allocation method 2019
Type
Cost allocation methods
Status
Current
AusNet Services (Transmission) - Cost allocation method 2019
Type
Cost allocation methods
Status
Current
Power and Water Corporation - Cost Allocation Method 2018
Type
Cost allocation methods
Status
Current
SA Energy Transformation RIT-T dispute
On 5 June 2019 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
AusNet Services (Distribution) - Cost allocation method 2018
Type
Cost allocation methods
Status
Current