Overview

Sector
Electricity
Segment
Distribution
Region
New South Wales
Status
Current
Commencement date
Effective date
AER reference
AER00064082

Ausgrid's cost allocation method (CAM) governs the manner in which Ausgrid is allowed to allocate costs to the distribution services it provides. Allocation of costs between services is required to accurately represent costs incurred in providing the respective services. This prevents cross-subsidisation between distribution services and other services Ausgrid provides.

On 26 October 2022 the AER approved the revised CAM submitted by Ausgrid in accordance with chapter six of the National Electricity Rules. Its revised CAM replaces Ausgrid’s previous CAM approved by the AER in 2014.

Key Documents

Ausgrid - Cost Allocation Methodology - October 2022

Download
Authors
Ausgrid
Content type
Document