Results
138 result(s), displaying 1 to 12
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
AusNet Services - Determination 2026–31
AusNet Services is an electricity distribution network service provider. Its next five year regulatory control period will be 1 July 2026 to 30 June 2031.
Type
Determinations
Status
Open
CitiPower - Determination 2026–31
CitiPower is an electricity distribution network service provider. Its next five year regulatory control period will be 1 July 2026 to 30 June 2031.
Type
Determinations
Status
Open
Jemena - Determination 2026–31
Jemena is an electricity distribution network service provider. Its next five year regulatory control period will be 1 July 2026 to 30 June 2031.
Type
Determinations
Status
Open
Powercor - Determination 2026–31
Powercor is an electricity distribution network service provider. Its next five year regulatory control period will be 1 July 2026 to 30 June 2031.
Type
Determinations
Status
Open
United Energy - Determination 2026–31
United Energy is an electricity distribution network service provider. Its next five year regulatory control period will be 1 July 2026 to 30 June 2031.
Type
Determinations
Status
Open
Transgrid - Cost Allocation Method 2023
TransGrid's cost allocation methodology (CAM) governs the manner in which TransGrid is allowed to allocate costs to the transmission services it provides.
Type
Cost allocation methods
Status
Current
CitiPower, Powercor, United Energy - Cost Allocation Method 2020
Type
Cost allocation methods
Status
Current
AusNet Services (Distribution) - Cost allocation method 2019
Type
Cost allocation methods
Status
Current
AusNet Services (Transmission) - Cost allocation method 2019
Type
Cost allocation methods
Status
Current