Main Central-West Orana Renewable Energy Zone network project (contestable)
Read our determination on the amounts to be paid to ACEREZ for the main Central-West Orana REZ network project.
Type
Determinations
Status
Open
Origin Retailer of Last Resort Cost Recovery Applications
The AER has approved Origin Energy's six cost recovery applications for costs incurred as the Retailer of Last Resort for retailer failures in 2022.
Type
Cost pass throughs
Status
Current
Waratah Super Battery – Network augmentation and SIPS control system
Read our determination on the costs of the non-contestable Network augmentation and System Integrity Protection Scheme control system component of the WSB project.
Type
Determinations
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2024−25
View our decision on the maximum amount electricity distributors can pass through to consumers in 2024-25 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current
Transgrid - Cost Allocation Method 2023
TransGrid's cost allocation methodology (CAM) governs the manner in which TransGrid is allowed to allocate costs to the transmission services it provides.
Type
Cost allocation methods
Status
Current
NSW Electricity Infrastructure Roadmap - Contribution determination 2023-24
View our decision on the maximum amount electricity distributors can pass through to consumers in 2023-24 as costs for the NSW infrastructure investment roadmap
Type
Cost pass throughs
Status
Historical
New South Wales: December 2025 - February 2026
The AER has made a T-3 Reliability Instrument under the RRO for a forecast reliability gap in New South Wales, from 1 December 2025-28 February 2026.
Type
Retail Reliability Obligation
Status
Revoked
South Australia: January - February 2024
On 12 March 2024, AEMO notified the AER that there were no compliance trading intervals during the 8 Janaury-29 February 2024 reliability gap period in South Australia. This notice brings this reliability instrument to a close.
Type
Retail Reliability Obligation
Status
Historical
New South Wales: January - February 2024
The Retailer Reliability Obligation (RRO) is designed to support reliability in the National Electricity Market.
Type
Retail Reliability Obligation
Status
Revoked
South Australia: January - March 2023
On 9 January 2020, the South Australia Minister for Energy and Mining triggered the RRO in South Australia for the first quarter of 2023.
Type
Retail Reliability Obligation
Status
Revoked
New South Wales: December 2026 - March 2027
The Retailer Reliability Obligation (RRO) is designed to support reliability in the National Electricity Market (NEM).
Type
Retail Reliability Obligation
Status
Open