Results
167 result(s), displaying 157 to 167
NSW: December 2027 - February 2028
The AER will make a decision on a T-3 Reliability Instrument under the RRO for a forecast reliability gap in NSW, from 1 December 2027 - 29 February 2028
Type
Retail Reliability Obligation
Status
Current
Victoria: December 2027 - March 2028
The AER will make a decision on a T-3 Reliability Instrument under the RRO for a forecast reliability gap in Victoria, from 1 December 2027 - 31 March 2028.
Type
Retail Reliability Obligation
Status
Current
Waratah Super Battery – SIPS battery service
Read our determination on the amounts to be paid to Transgrid for the System Integrity Protection Scheme battery service component of the WSB project.
Type
Determinations
Status
Current
Basslink - Determination 2025–30
On 15 September 2023, APA Group submitted additional information in support of the conversion application and a revenue determination proposal.
Type
Determinations
Status
Current
Ring-fencing guideline (electricity transmission) 2025
The AER has released version 5 of the ring-fencing guideline for electricity transmission.
Type
Ring-fencing
Status
Current
Ring-fencing guideline (electricity distribution) 2025
The AER has released version 4 of the ring-fencing guideline for electricity distribution.
Type
Ring-fencing
Status
Current
TasNetworks - Network support pass through 2023-24
AER’s has determined TasNetworks' 2023-24 positive network support cost pass through should be reflected in TasNetworks' maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
Powerlink - Network support pass through 2023–24
AER’s has determined Powerlink's 2023-24 positive network support cost pass through should be reflected in Powerlink's maximum allowed revenue for 2025-26
Type
Cost pass throughs
Status
Current
ElectraNet - Network support pass through 2023–24
AER’s has determined ElectraNet's 2023-24 positive network support cost pass through should be reflected in ElectraNet's maximum allowed revenue for 2023-28
Type
Cost pass throughs
Status
Current
AusNet Services - Cost pass through - February 2024 storm
AusNet's cost pass through application relates to distribution network costs incurred during Victoria's February 2024 storm.
Type
Cost pass throughs
Status
Current
NSW Electricity Infrastructure Roadmap - contribution determination 2025−26
View our decision on the maximum amount electricity distributors can pass through to consumers in 2025-26 as costs for the NSW infrastructure roadmap.
Type
Cost pass throughs
Status
Current