Results
60 result(s), displaying 1 to 12
Victoria to NSW Interconnector West (VNI West) RIT-T dispute
On 16 October 2023 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
NSW Electricity Infrastructure Roadmap - Contribution determination 2023-24
View our decision on the maximum amount electricity distributors can pass through to consumers in 2023-24 as costs for the NSW infrastructure investment roadmap
Type
Cost pass throughs
Status
Historical
North West Slopes and Bathurst, Orange and Parkes RIT-T disputes
On 29 November 2022 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
TransGrid - Network support pass through 2019–20 and 2020–21
Type
Cost pass throughs
Status
Historical
Reinforcing the NSW Southern Shared Network (Humelink) RIT-T dispute
On 24 November 2021 the AER published a determination clause 5.16B of the National Energy Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
Murraylink connection charge pass through 2019–20
Murraylink connection charge pass through 2019–20
Type
Cost pass throughs
Status
Historical
SA Energy Transformation RIT-T dispute
On 5 June 2019 the AER published a determination clause 5.16B of the National Electricity Rules.
Type
RIT-T and RIT-D disputes
Status
Historical
AusNet Services - Cost pass through - easement land tax 2018–19
Type
Cost pass throughs
Status
Historical